This project was to complete cycle lane and shared path facilities in the Grey Lynn area. There was a major challenge in that the work went along Richmond Road through the township part, where there is high vehicle and pedestrian volumes, as well as numerous store fronts and vehicle parks. We needed to reduce traffic to a single lane full time over a 400m length, including side roads
