Clevedon Water and Wastewater Network
Client
Brian Perry Civil
Location
South Auckland
Completed
Current (still constructing)
Challenge
Network improvements through the Clevedon Area (to and from the Ardmore pump station) are necessary for network growth and resilience. Unfortunately the road network in this area is a series of narrower high speed roads giving little room to accommodate construction concurrent with normal traffic flow.
Solution
Barrier system selection on this project was important - aiming to balance manoeuvrability with rigidity - which resulted in a new way of determining operating speed for carriageways and a risk-based approach to site design which has been a blueprint for other similar road environments since.
Results
The result was a highly flexible working space solutiuon that allowed for high productivity rates but also ensured protection of road users and road workers alike.
Team
Kava Aloua
Jolina Mendoza
Equipment used
Coming soon