Hunua 4 Watermain
Client
McConnell Dowell
Location
Central Auckland
Completed
Current (still constructing)
Challenge
This project is for Section 11 of the Hunua 4 Watermain project. This takes the pipeline from Market Rd through to Burleigh St in the city. Utilising busy, city streets as the route creates many issues involving high traffic volumes, noise in residential areas, access to businesses and residents, as well as very deep shafts that need protecting.
Solution
The working space constraints for the project have been a challenge, though fortunately with our help during the tender process the contractor was able to come up with a solution that had most of the pipeline being installed using trenchless methods. This has then only required major works at half a dozen specific locations
Results
Though the project is ongoing, the innovative solution of using trenchless technology combined with our TTM staging has ensured that the project has had considerably less impact on drivers and residents
Team
Andrew Young