Baypark to Bayfair Link (B2B)
Client
CPB Contractors
Location
Bay of Plenty
Completed
Current (still constructing)
Challenge
The section of very busy State Highway heading south from Mount Maunganui has had its capacity and function stretched for some time. A major upgrade was required but to construct - would be a challenge of conflicting needs. A keen balance would be required between construction productivty and space maximisation, and disruption (to vehicles, pedestrians, cyclists and even the railway).
Solution
Parallaxx hass supported this on-going project from inception with TMP design (including long term geometric TMP design), independent auditing and barrier design. Recently our services expanded to supplying the Traffic Manager who is embedded with the project team and oversees all traffic management operations for the project.
Results
By providing the Traffic Manager and all TMP design we are able to bring to bear the full expertise of our experienced team to ensure the project traffic management outcomes are met and exceeded. In this case, the contractor has the support of our whole team in one way or another - a formidable partner for any project with these such challenges.
Team
Andrew Young
Chris Harmer
Renier Oliver
Equipment used
Coming soon